D-SIMCON Use Cases

Sales Target Setting
Determination of Investment Requirements for Tool Purchases
Sales Target Setting
Setting of sales targets works hand in hand with determining which products are to be selected for production. Based on committed customer orders, forecasted demand and capacity constraints at the various tools, the optimal product mix can be determined on a regular basis, depending on objectives set by the sales team – maximise output, revenue or margin.
Determination of Investment Requirements for Tool Purchases
A quick determination of tool capacity required for a particular product mix and long-term production plan is often needed without having to go through the iterative and lengthy process associated with the constraints of a dynamic simulation model.
Sales Target Setting
Setting of sales targets works hand in hand with determining which products are to be selected for production. Based on committed customer orders, forecasted demand and capacity constraints at the various tools, the optimal product mix can be determined on a regular basis, depending on objectives set by the sales team – maximise output, revenue or margin.
D-SIMCON Load Mix Optimiser
Determination of Investment Requirements for Tool Purchases
A quick determination of tool capacity required for a particular product mix and long-term production plan is often needed without having to go through the iterative and lengthy process associated with the constraints of a dynamic simulation model.
D-SIMCON Static Capacity Engine

Mid-Term Capacity Management in Lithography Area
Analysis of Product Mix Change and Tool Ramp-up Planning
Evaluation and Tuning of Dispatch Rules
Adjustment of Queue Time Constraint Parameters
Tool Qualification and Dedication Adjustment Planning
Mid-Term Capacity Management in Lithography Area
To maximise the capacity utilisation in the lithography area while keeping cycle time low, the number of tools dedicated to a particular product/layer can be re-adjusted on a regular basis.
Analysis of Product Mix Change and Tool Ramp-up Planning
Analysis of tool capacity required for a particular product mix, long-term production plans, including tool phase-in and phase-out schedules can be carried out on a regular basis to prioritise bottleneck elimination projects and to understand the interdependencies with cycle times that can be committed.
Evaluation and Tuning of Dispatch Rules
Dispatch rules and priorities can be reviewed on a regular basis to react to changed product mix or and/or a reduction/increase of fab load and make sure that fab capacity is not lost due to over-constraining the system with too many of such rules.
Adjustment of Queue Time Constraint Parameters
Parameters associated with queue time constraints in the production can be reviewed and adjusted on a regular basis in order to maximise capacity without losing yield.
Tool Qualification and Dedication Adjustment Planning
Tool qualifications and dedications to products/recipes need to be reviewed on a regular basis to make sure that sufficient tools are qualified for all products but at the same time qualification is not carried our unnecessarily.
Mid-Term Capacity Management in Lithography Area
To maximise the capacity utilisation in the lithography area while keeping cycle time low, the number of tools dedicated to a particular product/layer can be re-adjusted on a regular basis.
D-SIMCON Static Capacity Engine
D-SIMCON Photo Dedication Optimiser
Analysis of Product Mix Change and Tool Ramp-up Planning
Analysis of tool capacity required for a particular product mix, long-term production plans, including tool phase-in and phase-out schedules can be carried out on a regular basis to prioritise bottleneck elimination projects and to understand the interdependencies with cycle times that can be committed.
D-SIMCON Dynamic Capacity Planner
Evaluation and Tuning of Dispatch Rules
Dispatch rules and priorities can be reviewed on a regular basis to react to changed product mix or and/or a reduction/increase of fab load and make sure that fab capacity is not lost due to over-constraining the system with too many of such rules.
D-SIMCON Dynamic Capacity Planner
Adjustment of Queue Time Constraint Parameters
Parameters associated with queue time constraints in the production can be reviewed and adjusted on a regular basis in order to maximise capacity without losing yield.
D-SIMCON Dynamic Capacity Planner
Tool Qualification and Dedication Adjustment Planning
Tool qualifications and dedications to products/recipes need to be reviewed on a regular basis to make sure that sufficient tools are qualified for all products but at the same time qualification is not carried our unnecessarily.
D-SIMCON Dynamic Capacity Planner

Available to Promise
Wafer Output Forecast
Analysis of Lot Priorities and Due-Date Performance
Available to Promise
As the capacity available to be promised to one customer is dependent on the capacity promised to another, responses to customer order enquiries can be supported by an Available-To-Promise (ATP) function, taking into account resource availability, current load of the fab and forecasted demand, to make sure that committed due dates are in line with capacity available and the associated production cycle times.
Wafer Output Forecast
Line control and other departments in the fab can be supported with a fab wafer out forecast at the granularity of choice, for example total number or wafer out per product group level to help plan resources in downstream facilities such as wafer test.
Analysis of Lot Priorities and Due-Date Performance
Regular assessment of lot priorities can be accomplished to make sure that margins associated with higher-priority lots can be maximised while maintaining or even enhancing due-date performance.
Available to Promise
As the capacity available to be promised to one customer is dependent on the capacity promised to another, responses to customer order enquiries can be supported by an Available-To-Promise (ATP) function, taking into account resource availability, current load of the fab and forecasted demand, to make sure that committed due dates are in line with capacity available and the associated production cycle times.
D-SIMCON Dynamic Capacity Planner
Wafer Output Forecast
Line control and other departments in the fab can be supported with a fab wafer out forecast at the granularity of choice, for example total number or wafer out per product group level to help plan resources in downstream facilities such as wafer test.
D-SIMCON WIP Forecaster
Analysis of Lot Priorities and Due-Date Performance
Regular assessment of lot priorities can be accomplished to make sure that margins associated with higher-priority lots can be maximised while maintaining or even enhancing due-date performance.
D-SIMCON Dynamic Capacity Planner

WIP Flow Forecast
Fine-Tuning of Preventive Maintenance Timing
Operator Resource Allocation
Wafer Start Planning
Sub Fab Material Planning
Engineering Lot Forecast
WIP Flow Forecast
Visibility is required with regard to anticipated Work in Progress (WIP) movement in the production line to forecast WIP waves and plan countermeasures accordingly.
Fine-Tuning of Preventive Maintenance Timing
By regularly adjusting the timing for Preventive Maintenance (either within time constraints or based on number of wafers processed since last PM) synchronisation with material flow can be enhanced and cycle time variability reduced.
Operator Resource Allocation
This is a special instance of the WIP Flow Forecast use case to make sure that operator resources are always aligned with expected wafer arrivals/moves in each work center.
Wafer Start Planning
The optimal pattern to release wafers into the production line, taking into account the capacity and load mix, can be determined on a regular basis.
Sub Fab Material Planning
A per-product and per-tool granularity WIP flow forecast in the fab can also enable much more pro-active material planning in the sub-fab. For example, anticipated dates for the replacement of photo resist bottles at coating tools can be determined with high accuracy. As a result, throughput losses because of non-availability of material can be avoided.
Engineering Lot Forecast
This is a special instance of the WIP Flow Forecast use case to make sure that engineering lots do not get stuck in production because tool qualification has not been carried out or other resources have not been provided in time.
WIP Flow Forecast
Visibility is required with regard to anticipated Work in Progress (WIP) movement in the production line to forecast WIP waves and plan countermeasures accordingly.
D-SIMCON WIP Forecaster
Fine-Tuning of Preventive Maintenance Timing
By regularly adjusting the timing for Preventive Maintenance (either within time constraints or based on number of wafers processed since last PM) synchronisation with material flow can be enhanced and cycle time variability reduced.
D-SIMCON WIP Forecaster
Operator Resource Allocation
This is a special instance of the WIP Flow Forecast use case to make sure that operator resources are always aligned with expected wafer arrivals/moves in each work center.
D-SIMCON WIP Forecaster
Wafer Start Planning
The optimal pattern to release wafers into the production line, taking into account the capacity and load mix, can be determined on a regular basis.
D-SIMCON WIP Forecaster
Sub Fab Material Planning
A per-product and per-tool granularity WIP flow forecast in the fab can also enable much more pro-active material planning in the sub-fab. For example, anticipated dates for the replacement of photo resist bottles at coating tools can be determined with high accuracy. As a result, throughput losses because of non-availability of material can be avoided.
D-SIMCON WIP Forecaster
Engineering Lot Forecast
This is a special instance of the WIP Flow Forecast use case to make sure that engineering lots do not get stuck in production because tool qualification has not been carried out or other resources have not been provided in time.
D-SIMCON WIP Forecaster

Dispatch List/Schedule Generation
Dispatch List/Schedule Generation
This use case comprises regular determination of the optimal sequence (schedule) of production lots to be processed at a group of tools with regard to maximising throughput, minimising queue time, minimising cycle time variability, or a combination of those.
Dispatch List/Schedule Generation
This use case comprises regular determination of the optimal sequence (schedule) of production lots to be processed at a group of tools with regard to maximising throughput, minimising queue time, minimising cycle time variability, or a combination of those.
D-SIMCON Scheduler and Dispatcher

Fab Incident Recovery
Fab Incident Recovery
After a major fab incident (such as a breakdown of a bottleneck tool) the best sequence of recovery actions can be determined to make sure that WIP bubbles can be depleted as quickly as possible. Such recovery actions can comprise activation of backup tools, temporary adaptation of dispatch policies, adjustment of wafer start plan, alteration of Preventive Maintenance timing, adjustment of sampling rate for inspection and measurement, etc.
Fab Incident Recovery
After a major fab incident (such as a breakdown of a bottleneck tool) the best sequence of recovery actions can be determined to make sure that WIP bubbles can be depleted as quickly as possible. Such recovery actions can comprise activation of backup tools, temporary adaptation of dispatch policies, adjustment of wafer start plan, alteration of Preventive Maintenance timing, adjustment of sampling rate for inspection and measurement, etc.
D-SIMCON WIP Forecaster
Use Cases Enabled by Highlighted Products
D-SIMCON Load Mix Optimiser
View Product
D-SIMCON Static Capacity Engine
View Product
D-SIMCON Dynamic Capacity Planner
View Product
D-SIMCON Photo Dedication Optimiser
View Product
D-SIMCON WIP Forecaster
View Product
D-SIMCON Scheduler and Dispatcher
View Product
D-SIMCON AI Evaluation Platform
View Product